Update: Factory Five Survives Blizzard of 2013

UPDATE: As of Tuesday, February 12th, we are 100% operational and back to building the best component car kits on the planet!

I am happy to report to you that Factory Five survived the huge North East blizzard without significant damage. Most areas are up and running and we are all back to work.


Nate Johnson and Chris Ronni clean up the factory after the storm!

Ops manager Nate Johnson and facilities guy Chris Ronni have been in charge of the clean-up. Nate even brought in a front-end loader for snow removal. Our resident Materials Manager Eddie Brundage is also a firefighter and worked around the clock as many power lines and poles were down in Wareham.

Thanks for all the kind words and also for all your patience. The crew prepared well for the storm and this time the weather guys didn’t get it wrong!

On a personal side, my house and neighborhood in Barrington, Rhode Island was without power for three days. I’ve got a generator, good friends, and spent the time with my son Adam making rounds, picking up firewood, and trying to lend a hand where needed. The highlight of the storm was driving to my parents in Boston in the middle of the storm with my 4-wheel drive F350. My father just had knee replacement surgery and my mother has advanced arthritis and needed help. The drive back south the next morning on abandoned roads was surreal!


A full vehicle travel ban, expect for emergency, utility, and medical was in effect rendering roads in Massachusetts and Rhode Island empty, allowing crews to clear the surfaces quickly.

All things considered, we are doing well. There’s a lot of folks helping each other and it just seems to me that when things are the worst is when Americans are at our best.

There’s a ton of snow (I think we ended up with 24 inches at work) and its hard to imagine that in a short while, we’ll be driving roadsters and laying down rubber on streets that are right now covered in snow-pack.

This Saturday’s Winter Open House will go on as planned. Talk to you guys soon!

Dave Smith
President


The building was well-prepped for the storm and the cars were tucked away warm and dry in the showroom.

Latest Factory Five News

Factory Five’s USA 250th Celebration Event!

2026 is off to a great start, and the team wants to keep the momentum going! They have put together a sale for all of our kits to help you build your car your way this year. Score a Free IRS Upgrade OR Save $2,026 Off Options on Mk5 Roadsters, Mk4 Roadsters, Type 65 Coupe, and ’33 Hot Rod To ensure your finest ride is possible, we are offering FREE IRS Upgrades (up to $3,199 in value). Our Independent Rear Suspension is the best suspension configuration Factory Five has to offer. This upgrade package includes: OR you can save $2,026… Read More »

Read More

Peter D. Graduates Mk5 Build for Son Scott’s Wedding

Factory Five customer Peter D. from Pfafftown, NC and his son Scott started to put thier Mk5 Roadster plans together early in Fall 2025. The submitted their order in mid-October 2025 with the kit arriving in mid-December. They soon started to inventory the kit and start building the car as they had a goal of having the Mk5 featured at Scott’s wedding in June 2026. “I am a retired healthcare administrator, and Scott is a project manager for a transportation company,” wrote Peter on The Factory Five Forum. “We are both very mechanically minded. I bought my first car at 14… Read More »

Read More

Rob M. Reaches First Start Milestone!

There’s many milestones when building a Factory Five including getting the kit in your garage, making it a roller, engine install, and of course, graduating the build. One of the most exciting ones though is the first start, and customer Rob M. from Suttons Bay, MI recently shared his Mk4 firing up for the first time on The Factory Five Forum! “First start was a success!” wrote Rob on the forum. “Dad made it up and we had perfect weather. I primed the fuel pump with my power probe and got the pressure right at 65 psi per the Gen… Read More »

Read More
Top